2. Implementation of the expulsion line works with a length of 1250 meters of GRP pipes with a diameter of 1600 mm (completed)
3. Extending the internal piping network with a total length of 30,000 meters (work in progress)
4. Extension of GRP pipe network with diameters up to 1200 mm
5. Extension of HDPE pipe network with diameters up to 700 mm
6. Implementation of a metal structure for sludge heating, building area 8500 m Installation of steel structure GREENHOUSE (completed)
7. Implementation of cable ducts for low and medium voltage and electrical rooms Installing of duct bank for LV & MV and Electrical pits (work in progress).
8. Implementing the work of the storm water system & external ditch (work in progress)
9. Implementation of concrete works with a total quantity of 18,000 m3.
10. Implementation of the Dividing Wall (completed)